About Our Programs>Current Projects>Implementation Project - Phase I>Constructed Wetland in Suttons Bay

Inland Seas Education Association Constructed Wetland
- COMPLETED -

Project Partners: Inland Seas Education Association (ISEA), Grobbel Environmental Associates, Traverse Bay Area Intermediate School District (TBAISD), US Fish & Wildlife Service (USFWS)

In May 2006 TWC helped ISEA install a constructed wetland on their property to help treat and improve stormwater runoff. TWC was just one of a handful of partners who helped provide funding for ISEA to complete this project and see it to fruition.

Two years ago ISEA began exploring solutions to the polluted runoff flowing across their parking lot into Grand Traverse Bay. The runoff originated from the streets of downtown Suttons Bay and a nearby gas station and was causing oil, gas, grease, and other pollutants to wash directly into the bay. Additionally, the runoff was causing gully erosion along the shoreline. What evolved was a plan to stabilize 200 feet of their shoreline using "soft" engineering and natural materials, and create a wetland located between the ISEA building and the bay to treat the stormwater runoff.

The finished 0.5 acre, constructed wetland includes a grassed waterway and two wetland basins that will treat runoff from an approximate 2.3 acres of urbanized area in downtown Suttons Bay including commercial buildings, parking lots, roads and a gasoline retail station. Regular monitoring of pollution levels by Inland Seas' professional staff and volunteers will be conducted quarterly. The area has already attracted a collection of wildlife including Canada geese, mallards, and many, many frogs!

As part an ongoing project, ISEA will be developing a wetland/runoff treatment curriculum for the general public, riparian property owners, managers and students. This will include a self-guided walking tour with interpretive signs and a brochure. A more formal instructional program for students and professionals will be developed.

Pollutant Load Reduction:
We anticipate that the shoreline stabilization project will prevent approximately 3.2 tons of sediment, 2.7 lbs of Phosphorus, and 5.4 lbs of Nitrogen from entering Grand Traverse Bay annually. Additionally, the constructed wetland will prevent a further 1.01 tons, 1 lb Phosphorus, and 6 lb Nitrogen from annually entering the Bay via stormwater runoff.

Total Savings -
  • 4.21 tons Sediment

  • 3.7 lbs Phosphorus

  • 11.4 lbs Nitrogen



Click on the pictures below to check out some cool before/after shots of the wetland.
Click here to view full size picture
This page last updated on 3/30/2007.
If you have any questions or problems while using our website please contact us at 231.935.1514 or info@gtbay.org
Watershed Center Home
Search This Site
Characteristics
Frequently Asked Questions
Interactive Maps
Water Quality Database
Grand Traverse Bay Shoreline Inventory
Current Watershed Center Projects
Past Watershed Center Projects
Other Watershed Projects
Our Mission, Vision, & Values
History
Our Board
Our Staff
Partners & Collaboration
Watershed Protection Plan
Grand Traverse Baykeeper®
Water Quality Database
Water Quality Monitoring
Stream Search
Outreach & Education
Current Projects
Past Projects
Time & Talent
Donate
Wish List
Events Calendar
Newsletters
Articles
News Releases
Publications & Reports
Useful Links
Add Page to My Watershed
Use My Watershed
About My Watershed
Log In to use My Watershed